0370 240 2381
Murphy and Sons hired 1300 TPA Aluminium Traxpanels, to provide a vital temporary roadway for traversing vehicles over challenging ground to allow access to a railway bridge at the Odell Viaduct in Bedfordshire. The bridge which is being demolished and reconstructed, is part of the £1.5 billion investment by Network Rail to upgrade the Midland Main Line.
Portable roadways supplied by temporary access solutions provider TPA are protecting land from damage and helping deliver a major 30-mile power line refurbishment in the most cost-effective way.
A bespoke access solution was provided for a Geotechnical Contractor in a sensitive location to enable ground investigation tests and directional borehole drilling. This project forms part of the ground investigation framework for HS2 with site investigations (SI) being undertaken to demanding standards.
Since joining the company back in January 2003, Oliver started out as Drivers Mate and worked his...
Ecological consultancy Ecosulis carries its own fleet of 50 floats but turns exclusively to TPA...